Treatment of construction structure decoration details of purification workshop
Release time:2019-12-19 source:
In the construction process of purification workshop, the structural decoration part is the key point of the whole project, which directly affects the use and aesthetic effect of the whole purification workshop project. In this respect, some specific construction details should be paid attention to:
(1) according to the requirements of the design specifications, the cleaning workshop shall be designed and installed to avoid the parts that are not easy to clean in use. During the cleaning and decoration, the gap between the joint part of the door and window installation and the building, the cleaning air conditioning, various pipelines and lighting fixtures shall be sealed.
Treatment of construction structure decoration details of purification workshop
(2) all accessories, partition wall, ceiling fixing and hanging parts can only be connected with the main structure, and can not be mixed with equipment and pipeline support, so as to prevent decoration materials from loosening and dust falling off due to microseism.
(3) the gap between building decoration and doors and windows shall be sealed at the front.
(4) according to GMP certification and inspection standards, interior decoration shall meet the following requirements:
A. materials with good air tightness and small deformation under the change of temperature and humidity shall be selected.
B. the wall and ceiling surfaces shall be smooth, flat, free from dust, dust, corrosion, impact, easy to clean, and concave and convex surfaces shall be reduced. Fillet with radius equal to 50mm shall be made at the joint of wall and ground. The wall color should be harmonious, elegant and easy to identify pollutants.
C. the doors and windows shall be straight with the inner wall, and the structure shall fully consider the sealing of air and water vapor, so that the pollution particles are not easy to penetrate from the outside, and prevent condensation due to the indoor and outdoor temperature difference. The interior doors, windows and partitions between rooms with different cleanliness shall be sealed.
(5) during the construction of the purification workshop, the dust emission during the construction shall be controlled, especially the concealed space such as the ceiling and the interior of the sandwich wall, which must be cleaned at any time.
(6) in the room where the high efficiency filter has been installed, the decoration with dust is not allowed.
(7) pay attention to the protection of the completed working surface, and do not cause plate depression, dark crack and pollution of surface decoration due to impact, knocking, trampling, water operation, etc.
Shandong ed purification Engineering Co., Ltd. focuses on laboratory system engineering, medical purification engineering, purification workshop system engineering. It has relevant business qualifications in the industry, from engineering consulting design, construction management, equipment and consumables supply, technical services, to laboratory certification, maintenance management, etc., to provide a comprehensive and complete solution for the medical purification engineering, laboratory system engineering, purification workshop system engineering industry. For more knowledge of medical purification industry, please pay attention to wechat public number: aide-188 (ED purification oxygen supply)