Talking about the specific installation and operation process of digital integrated operating room
At present, digital hospital is the future direction of hospital development, and the surgical operating room as the core of the hospital is the most important. The construction of integrated operating room system is the symbol project of hospital digital management, which can enhance the link management of the hospital and enhance the popularity of the hospital. After the implementation of this system, the hospital can make full use of the existing equipment, reduce the waiting time of patients, improve patient satisfaction, attract more patients and doctors studying, and bring more benefits to the hospital. At the same time, it provides effective and practical tools for managers. Hospitals can manage real-time, orderly, systematic and supervisory management, improve the utilization rate of hospital equipment resources, complete the scientific and systematic accumulation of hospital patient information, improve diagnosis and treatment insurance, reduce investment risk, and create excellent social and economic benefits for hospitals.
Digital integrated operating room is the perfect integration of purification engineering and digital information, and the best way to integrate all information about patients. It enables surgeons, anesthesiologists and nurses to obtain comprehensive patient information, more image support, accurate surgical navigation and smooth external information exchange. Zhenbang provides a more accurate, safer and more efficient working environment for the whole operation. It also provides a reliable channel for operation observation, operation teaching, remote teaching and remote consultation, thus creating a high success rate, high efficiency, high safety and improving the external communication of the operating room. So what is the specific installation process of digital integrated operating room? Ed Purification tells you:
▲Measuring installation space
▲Install embedded parts at the top of installation space
▲Lifting "Air-conditioning Unit for Clean Operating Room"
▲Assembly body skeleton
▲Installation of modular wallboard
▲Installation of arc panel and arc angle
▲Install roof
▲Installation of air supply smallpox
▲Installation of LED Lamp Belt
▲Installation of power outlet box
▲Installation of viewing lamp
▲Installation of "Digital Operating Room Integrated Control System"
▲Installation of return air outlet
▲Installation of vent
▲Installation of silent duct
▲Installation of medical cabinets
▲Install single-open air-tight flat-open door
▲Installation of Electric Airtight Valve
▲Laying Plastic Floor
▲Installation of Shadowless Lamp
▲Installation of equipment towers and anesthesia towers
▲Installation of operating table
Shandong Aide Purification Engineering Co., Ltd. has the second-level qualification of professional purification engineering. It has strong strength and rich experience. It is a good choice to strictly control every detail of the purification engineering and ensure the quality of the cleaning operation room. To learn more about the medical purification industry, please pay attention to the Wechat Public No. Aide-188 (Ed Purification and Oxygen Supply)