Discussion on the cost control measures of ED operating room purification project in different construction stages
Release time:2020-03-01 source:
The cost of purification engineering in operating room, which adopts many purification technologies, should also be reduced as much as possible for customers without reducing the purification effect, so the cost control is particularly important. The cost control should run through the whole construction process, and the construction cost control of purification engineering in operating room can be divided into prior control and process control Different cost control measures are taken in different construction stages.
1. Cost control in signing contract and construction preparation stage of ED operating room purification project
The cost control of the operating room purification project in the construction preparation stage is prior control. The meticulous work in this stage will directly determine the total cost of the project, which is one of the very important stages of the whole project. Therefore, the cost control in the construction preparation stage should do the following work:
(1) Firstly, the cost control objectives of the project shall be determined according to the "tender" and the signed construction contract, the cost of the proposed project shall be decomposed, the cost control objectives shall be proposed according to the single project, and the basis for cost control shall be laid;
(2) Do a good job of field investigation and research before construction, according to the investigation data, combined with the site construction environment conditions and resource conditions, develop a feasible construction organization design, construction schedule, material supply plan, so as to avoid the possible risks and reduce the construction cost;
(3) Refine the cost control objectives, make the project organization design, construction schedule and optimize the construction scheme according to the scale and nature of the project. The project cost control responsibility is divided into engineering department, financial department, material supply department and security department to form a comprehensive and all staff cost control system, and the total cost target of the project is modified to improve its rationality and feasibility.
2. Cost control measures in the specific implementation of ED operating room purification project
The cost control in the construction stage of operating room purification project is the key stage of the whole cost control. The cost control in this process should be dynamic, because the change of construction conditions is unpredictable, and there are many internal and external factors that affect the construction. Therefore, after the actual environment changes, various plans should be adjusted in time to keep the construction cost under control 。
(1) Collect information. In addition to mastering the construction progress, quality information and material consumption at any time, it is necessary to collect financial information, market material price and labor price information. According to the collected information, it is necessary to constantly correct the deviation and control the increased project construction cost to the minimum;
(2) Pay attention to material saving. According to statistics, the material cost generally accounts for about 70% of the direct engineering cost. Therefore, the purification project of ED operating room should strengthen the site management and select new technology and materials to minimize the material consumption;
Shandong ed purification Engineering Co., Ltd., founded in August 2010, has been committed to the construction of special departments in the hospital for ten years. It is a professional enterprise engaged in clean operating room purification, clean operating room decoration, ICU ward construction, newborn NICU construction, CCU ward, hospital laboratory, central supply room decoration, laminar flow ward construction, vein configuration center design and construction. The company integrates professional scheme design team, complete supporting product channels, professional system construction team and perfect after-sales service. With the relevant construction qualification issued by the national construction department; with an experienced engineering technology research and development team; with years of professional accumulation in the field of purification, combined with the construction management practice of many domestic projects, to provide comprehensive and high-quality overall purification system technical support for domestic customers. For more knowledge of cleanroom cleanroom industry, please pay attention to WeChat official account: Aide-188 (Ed purified oxygen supply).