Planning and Design of Aseptic Laboratory and Construction Solutions
Release time:2019-07-09 source:
Aseptic laboratory is also called aseptic laboratory. It is mainly used in biochemistry, biomedicine, microbiology, animal experiments, gene recombination and biological products, etc. It is called clean laboratory. According to many years'experience in industry, Fengchuang Science and Technology of Guangxi believes that the design and construction of aseptic laboratories need to focus on the following contents:
Planning and layout of aseptic laboratories
1. Composition: The aseptic laboratory consists of six parts: preparation room, washing room, sterilization room, aseptic room, constant temperature culture room and general laboratory. The common features of these rooms are that the floor and walls are smooth and hard, the equipment and equipment are simple and easy to clean.
2. Internal and external requirements: Aseptic laboratory should have two rooms, inside and outside, inside is aseptic room, outside is buffer room. All rooms should not be too large, ceiling should not be too high, to facilitate air sterilization.
3. Safety requirements: Aseptic laboratories and biosafety laboratories must ensure personal safety, environmental safety, waste safety and sample safety, and can operate safely for a long time. At the same time, they also need to provide a comfortable and good working environment for laboratory staff.
Planning and Design of Aseptic Laboratory and Construction Solutions
II. Basic Requirements and Configuration Conditions of Aseptic Laboratories
(1) Preparatory room - Preparatory room for preparation of culture medium and sample treatment, etc.
There are reagent cabinets, special cabinets for storing utensils or materials, power supply, electric furnaces, refrigerators, test benches and upper and lower sewers in the room.
(2) Washing room - Washing room for washing utensils, etc.
Because used utensils have been contaminated by microorganisms, sometimes there are pathogenic microorganisms. Therefore, in the case of conditions permitting, it is best to set up a washing room. Indoors should be equipped with heaters, steamers, basins and barrels for washing utensils, as well as various bottle brushes, soaps, detergents, etc.
(3) Sterilization room - Sterilization room is mainly used for sterilization of culture medium and various instruments.
Sterilization equipment and facilities such as oven and high pressure steam sterilizer should be provided in the room.
(4) Aseptic room - a special laboratory for systematic inoculation and purification of bacteria and other aseptic operations
Aseptic room is also called inoculation room. In microbial work, inoculation and transplantation of bacteria is a major operation. The characteristics of this operation are to ensure the pure strain of bacteria and prevent the contamination of miscellaneous bacteria. In the air of general environment, because there are many dust and bacteria, it is easy to cause pollution, which greatly interferes with the vaccination work.
Planning and Design of Aseptic Laboratory and Construction Solutions
III. Major Components of Construction and Decoration of Aseptic Laboratories
1. Constructing well-sealed enclosure;
2. Clean and sanitary floor treatment;
3. High quality air conditioning and circulating purification filtration system;
4. Sensitive clean detection system and control system;
5. Design reasonable pneumatic isolation system.
IV. Design Scheme of Aseptic Laboratory
(1) The overall structure of aseptic laboratories:
1. Buildings designed by aseptic laboratories should be durable, easy to maintain and clean, and have structures that can prevent contamination of food, food contact surfaces and internal packaging materials (such as invasion, habitation and reproduction of harmful animals).
2. In order to prevent cross-contamination, personnel corridors and material transport corridors should be set up separately. Personnel corridors should be strictly implemented according to the requirements of clean room corridors. Each corridor should be equipped with air curtain (i.e. wind curtain) or two-way spring door and electronic fly (mosquito) killer and other insect prevention facilities.
3. The openings around pipes, doors, windows and ventilation channels that lead to the outside world should be fully filled. All windows, vents and fan openings should be covered with protective nets.
4. The height of aseptic laboratory should meet the requirements of technology and sanitation, as well as the needs of equipment installation, maintenance and maintenance.
(2) Operating desk of aseptic Laboratory
Aseptic workspace is best replaced by aseptic workbench or clean workbench, which needs to be placed farthest from the door.
(3) Ground of aseptic laboratories
The ground designed by aseptic laboratory should be paved with non-toxic, non-slip, non-seepage, non-water absorption, non-crack and easy to clean and disinfect building materials (such as acid-resistant bricks, terrazzo, concrete, etc.), and the ground should have appropriate gradient (1.0-1.5% is appropriate).
(4) Roof and ceiling of aseptic Laboratory
1. The roof and ceiling should be coated with light-colored materials which are not absorbent, clean, non-toxic, mildew-proof, corrosion-resistant and easy to clean.
2. Steam, water, electricity and other auxiliary pipes should not be installed above the food and food contact surface to prevent dust or condensate from falling into it.
(5) Sterile laboratory walls, doors and windows
1. The walls of aseptic laboratories should be constructed with light-colored materials which are non-toxic, non-absorbent, non-seepage, mildew-proof, smooth and easy to clean. The height of decoration with this material should be up to the roof.
2. All doors and windows shall be constructed with rust-proof, moisture-proof and easy-to-clean sealing frames.
(6) Lighting and lighting facilities in aseptic laboratories
The aseptic laboratory should have sufficient natural lighting or artificial lighting, the mixed illumination of the working face in the processing site should not be less than 300 LUX, and the batching and filling workshop should not be less than 800 LUX.
Planning and Design of Aseptic Laboratory and Construction Solutions
(7) Air treatment and purification facilities in aseptic laboratories
1. Effective ventilation equipment must be installed in aseptic laboratories. The air flow direction should be from clean areas to non-clean areas. When mechanical ventilation is used, the ventilation volume should be greater than 3 times per hour.
2. The temperature of sterile laboratory should be controlled between 15 and 27, and the humidity should be controlled below 50%.
3. At the entrance of aseptic Laboratory3. The entrance of aseptic laboratory should be equipped with purification facilities for personnel and materials respectively.
The general acceptance criteria in the industry are that the number of bacteria on the plate in the 100-grade clean area should not exceed one colony on average, and that in the 10,000-grade clean room should not exceed three colony on average. Besides the current criteria, regular maintenance and maintenance should be carried out. Only with reasonable material selection index, proper purification grade and long-term management and maintenance, can aseptic laboratory play its due role.
Edward Purification brings together many excellent professional and technical personnel, with a number of senior engineers and experienced professional designers and engineering construction team. With advanced design concepts, high-quality construction team, in accordance with the hospital construction standards, operating room standards, ICU construction standards, laboratory-related construction standards, SPF animal room construction standards and other combination, give full play to their own technical strength, use advanced equipment, combined with advanced technology at home and abroad, reasonable design, scientific construction. Safety, environmental protection and energy-saving high-quality projects.