Construction Procedure and Scheme of Purification Project
Release time:2019-09-20 source:
Construction procedure and scheme of purification project:
(1) Construction procedures
Because of the high requirement for the finished construction products in the purification air-conditioning project, the main requirements are sealing and cleanliness. Therefore, in the construction process, strict technical discipline and coordination of civil engineering, decoration, installation and other professional cooperation. The construction procedure is carried out according to the following procedures.
(2) Construction requirements and technical measures
This clean air conditioning project must be constructed in accordance with the Code for Construction and Acceptance of Ventilation and Air Conditioning Engineering (GBJ243-82) and the Standard for Quality Inspection and Assessment of Ventilation and Air Conditioning Engineering (GBJ304-88).
The project requires that the final system be clean at 1 m3.
There are no more than 35 *10000 and 35 *100000 particles in the air and no more than 2500-25000 particles in the air. The tightness of the system is that the air leakage rate is less than 2% (the air duct system requires light leakage test, which is replaced by higher air leakage test in this project).
In order to meet the above requirements, the following construction technology measures are formulated:
1. To meet the cleanliness requirements
(1) The air duct shall be operated in the workshop so as not to make the air duct difficult to keep clean due to long distance transportation.
(2) Air control work requires a clean construction site, such as building, waterproof doors, windows and roofs, and construction of ground concrete after completion.
(3) Galvanized sheet for air duct processing must be of high quality, and galvanized sheet must be cleaned, cleaned and dried with detergent before processing. Century Star introduced that if the surface of galvanized sheet blisters off, it is necessary to brush phosphating primer and zinc yellow primer once, and mix paint twice (detergent needs to be neutral, and test first, qualified and then use).
(4) The production site is clean, garbage is often cleaned, gloves are not allowed to be greasy, galvanized sheets and air ducts are not allowed to drag on the ground, and shoes are not allowed to step on the clean galvanized sheet.
(5) When making flange hoisting and fan seat, cutting, rust removal, welding and air control work site are separated, and iron parts can be assembled and installed only after brushing oil and drying.
(6) After closing the small air duct, the two ends should be sealed with plastic cloth and placed in a clean site. When the small air duct is installed, it will be transported to the site and then removed. After the big air duct is cleaned again before installation, it will be installed.
(7) The support and hanger for the installation of air duct shall be carried out before the air duct is transported to the installation site for drilling and repairing the reserved holes.
(8) It is forbidden to use cotton yarn-prone fabrics for wiping air ducts and galvanized iron sheets, but stronger cotton fabrics are needed.
(9) Tools, machines, overalls and gloves should be kept clean.
Shandong Aide Purification Engineering Co., Ltd. has strong technical strength and construction experience, according to the different needs of clean places, using professional equipment, to form different levels of clean standard space, to create the most suitable production and working environment. At present, it has established close cooperation with many enterprises and is a trustworthy professional purifying project implementer. To learn more about the medical purification industry, please pay attention to the Wechat Public No. Aide-188 (Ed Purification and Oxygen Supply)