Method of Equipment Maintenance and Maintenance in Dustless Workshop
Release time:2019-08-14 source:
In order to ensure that the equipment in the dust-free workshop is in a good technical state, give full play to the normal performance of the equipment and prevent the equipment from deterioration, a good system of equipment maintenance and maintenance should be established in the equipment management procedure. What records should the maintenance personnel make when the equipment in the dust-free workshop is maintained?
1. Warning signs should be hung during electrical maintenance, and two persons should be present. Open fire should be strictly prohibited when contacting inflammable and explosive materials.
2. After completion of maintenance, the maintenance debugging sheet should be filled in in time. The contents should include the name of equipment, type, cause of failure, maintenance items, maintenance time and maintenance personnel, etc. It should be archived and saved as the data of equipment verification.
3. Maintenance or replacement should be carried out in time according to the maintenance content and time limit stipulated by the equipment. At the same time, maintenance records should be made well.
4. Complex maintenance work should be arranged by at least two persons, and should not be handed over to others halfway without special reasons in order to prevent errors.
5. After the test run, the maintenance personnel should fill in the maintenance record in detail, and tell the operation manager the cause of the failure, and point out the matters needing attention in the operation of the equipment.
6. The disassembly of components shall be carried out in strict accordance with the equipment maintenance instructions. The unloaded parts should be numbered or assembled in order.
7. Check in detail whether the parts are damaged or not. Be meticulous. Oil and rust-proof immediately after repairing the rusty parts.
8. When assembling parts of equipment, the requirements of operation or maintenance instructions shall be strictly followed. For new equipment, don't blindly install it before you understand the principle.
9. For fans, pumps and other equipment, the site should be cleaned carefully before commissioning after maintenance, in order to prevent tools from being lost in the equipment. If the number of tools is found to be insufficient, it must be checked again to confirm that there is no abnormality in the equipment before the formal test run. Direct start-up operation is absolutely not allowed.
Edward Purification has been developing in the field of clean Engineering for many years, and has implemented a series of workshop purification projects. For some difficult projects, it has been perfectly completed through excellent technical strength and well-trained construction team of clean engineering. To learn more about the medical purification industry, please pay attention to the Wechat Public No. Aide-188 (Ed Purification and Oxygen Supply)