Quality Management Standard for Construction of Purification Project
Release time:2019-08-20 source:
The quality control of purification project in different stages of construction is mainly divided into three stages. Next, Ed Purification will introduce the relevant process quality management standards.
1. Quality control should be carried out when construction activities are formally started, and a perfect quality assurance system and management system should be established. Various management systems and related inspection methods are shown in the construction. Quality inspection of raw materials, semi-finished products and finished products required in the whole project. For the convenience of drawings, it is necessary to review them comprehensively and determine the construction process and technology. Audit reports should be made on the technologies, processes and materials used. The relevant stakes of buildings should be carefully checked.
2. Quality control in the construction process, the main content of work is to improve the quality control in the early stage, to manage the influential factors in a unified way, to deal with and solve the key problems for quality information and icons. When exchanging between different processes, do a good job of acceptance and acceptance, and do not carry out the construction of the next process for those who do not meet the standards until the quality meets the requirements. For unaccepted projects or the use of non-certified materials, the Engineer may order the project manager to stop work.
3. At the end of the project, the quality of the products under construction should be checked and remedied. Complete the inspection and acceptance of relevant contents, collate technical data, and repair the project during the warranty period. The quality of construction plan is to make construction progress and control plan, fully consider the balance of all aspects, rationally arrange construction process and plan, cooperate with construction workers, and rationally allocate materials and machinery. When time limit and quality conflict, priority should be given to quality. Give full play to people's subjective initiative and catch up with the time limit.
In the process of construction, quality should be put in the first place. We are putting forward advanced, scientific and reasonable construction methods. The audit and design of the whole drawing are the same. We should make in-depth study to solve these problems technically and complete the guarantee and quality guarantee.
Shandong Aide Purification Engineering Co., Ltd. has been engaged in the installation business of purification engineering for many years. It has the experience of food aseptic workshop design, pharmaceutical GMP workshop design, electronic clean workshop design, cosmetics purification room design, and has many senior engineers and a professional, responsible and skilled high-quality construction team. Team, engineers absorb advanced clean technology, the latest design concept, according to the need to purify the different sites, site survey, provide customers with a complete set of planning, design, maintenance program, dispatch project director in charge of project site management, from the beginning of construction to project delivery to implement the whole process of management and control, aiming at fighting. Create the most suitable production and working environment!