The problems of the completion acceptance of the purification project in the clean workshop
Release time:2019-11-26 source:
The completion acceptance of the purification project in the workshop of the clean workshop is carried out after the single unit test run of each division and the test run of the system without production load is qualified. The content of completion acceptance is to check the single unit test run and no production load system test run of each divisional works, test and debug the performance parameters of clean room (area), check the appearance quality of each divisional works, and carry out functional test and debugging as required.
I. when the purification project of clean workshop is completed and accepted, the data of completion and acceptance shall be carefully checked, generally including the following documents and records:
1. Drawing joint review record, design change notice and as built drawing;
2 factory certificate and mobilization inspection report of main equipment, materials, instruments and meters of each subproject;
3. Installation and inspection records of single equipment and system of each subproject;
4. Test run records of each unit;
5. No load test run and commissioning records of all divisional works and systems;
6 test and inspection records of various pipelines;
7 inspection and commissioning records of safety facilities of each divisional works;
8 quality acceptance records of each divisional works.
II. The main test contents of the completion acceptance of the purification project of the clean workshop are as follows:
1. Air flow visual inspection;
2. Wind speed and air volume test;
3. Leakage detection of air filter;
4. Airtightness test of clean room (area);
5 static pressure difference test between rooms;
6. Air cleanliness level;
7. Self purification time;
8. Temperature and relative humidity;
9 illuminance value;
10 noise level;
11 other testing items required by the construction party.
III. after the completion acceptance of the purification project of the clean workshop is qualified and verified and approved, the functional acceptance shall be carried out according to the requirements. The functional acceptance is carried out in the "static" test, and the main test contents are as follows:
1 test the air cleanliness level;
2 if the production process requires, microbiological test, chemical pollutant test or cleanliness test of special surface shall also be carried out;
3. Stability test of temperature and relative humidity in clean room (area);
4 test self-cleaning time;
5. Test the airtightness of the clean room (area);
6 measure the illuminance;
7 measure the noise level;
8 when necessary, confirm and record the air flow form and air change times;
9 other test items to be carried out.
IV. after the use acceptance of the clean workshop, the use acceptance report shall be prepared, which mainly includes:
1. Description of the opening status of various facilities (including production process equipment) in the clean workshop;
2. Description of clean room (area) personnel tested and their activities;
3. Itemized test records and analysis opinions (including test point location, coordinates, etc.);
4. Valid calibration certificate of test instrument;
5. Issue relevant conclusions for acceptance.
As a powerful purification engineering company in China, Shandong ed purification Engineering Co., Ltd. has a special project department responsible for the design, production, installation and commissioning of purification in food workshop, cosmetics workshop, printing and packaging workshop, and electronic dust-free workshop. The company integrates professional scheme design team, complete supporting product channels, professional system construction team and perfect after-sales service. With the relevant construction qualification issued by the national construction department; with an experienced engineering technology research and development team; with years of professional accumulation in the field of purification, combined with the construction management practice of many domestic projects, to provide comprehensive and high-quality overall purification system technical support for domestic customers. If you want to know more about the workshop purification construction, please contact the engineering personnel of the project department in detail. For more knowledge of medical purification industry, please pay attention to WeChat public address: Aide-188 (Ed purify oxygen supply).