What are the configuration requirements for the basic equipment in the clean workshop
Release time:2019-11-18 source:
The environment of the clean workshop and the basic equipment which need to be installed in the clean workshop determine their respective roles. In the construction process of the dust-free workshop, in addition to the basic civil buildings, various infrastructure and purification equipment will be installed in the later stage to realize the daily operation of the auxiliary clean workshop and provide the clean and dust-free operation function. Next, EDP will explain the infrastructure requirements of the clean workshop:
1. The air inlet system of the clean workshop shall be installed, the air filter box shall be newly built, and the Central purification air conditioner (the Central purification air conditioner shall be divided into three filter sections of primary efficiency / medium efficiency / high efficiency) shall be an efficient air supply port at the end. If necessary, a purge plenum is also installed.
2. The clean workshop return air system, return air outlet, filter primary effect device and medium effect return air box shall be installed in the clean workshop.
3. Enter the buffer zone before entering the clean workshop. The buffer door is equipped with electronic interlock device, and the storage cabinet is equipped with clean storage room and air freshener.
4. The personnel and goods must pass through the clean workshop, air shower, goods shower, and the transfer window to transfer small items.
5. The status of the equipment itself, operation status, equipment status and safety distance between the equipment should be considered. Equipment layout shall consider creating conditions for operators to manage multiple equipment or multiple equipment, not too tight or too loose, try to be symmetrical and compact, arrange in order, and make full use of the space of clean workshop.
6. The automatic monitoring instruments of the equipment in the clean workshop shall be under centralized control, and the valve control shall be centralized as far as possible to facilitate the operation of the workers in the clean workshop. It is required that the equipment can enter and leave the clean workshop smoothly. Through the floor equipment, lifting holes shall be set on the floor to ensure good air tightness, smooth surface, no dust generation, no dust accumulation and no leakage.
7. All heavy equipment in the clean workshop or equipment that will produce severe vibration during operation shall be arranged on the bottom floor as far as possible to reduce the load.
The above is the basic equipment configuration requirements of the clean workshop in the purification project. Do you understand?
As a purification engineering enterprise with professional scheme design, system engineering construction and supporting product sales, ed purification has professional purification engineering level II qualification, strong strength and rich experience. It is a purification factory worthy of customers' trust to strictly control every detail of purification engineering and guarantee the quality of purification operating room. For more knowledge of medical purification industry, please pay attention to WeChat public address: Aide-188 (Ed purify oxygen supply).
Previous article:
Next article: