What are the requirements for the decoration design of hospital cleaning operating room?
Release time:2019-07-12 source:
(1) The walls and ceilings are made of sound-proof, solid, smooth, void-free, fire-proof, moisture-proof and easy-to-clean materials. Light blue and light green are the best colors. The viewing lamp, medicine cabinet and operating table should be set in the wall. The Yin (Yang) angle of the wall and flat roof, the wall and the ground and the intersection of different walls and walls should be made into small rounded corner structure (R < 50mm), so as to avoid dust accumulation and facilitate cleaning.
(2) The door should be wide and without threshold. The net width should not be less than 1.4m. It is convenient for flat cars to enter and exit. The swinging spring door should be avoided in order to prevent dust and bacteria from flying by airflow. It is advisable to use electric suspended automatic induction door with automatic delay closing device. The window should be double-decked, with aluminium alloy window frame, which is advantageous for dust-proof and heat preservation. Brown is the best colour for window glass.
(3) The net height of the cleaning operating room should be 2.8-3 m, and the width of the corridor should be no less than 2.5 m, so as to facilitate the operation of flat cars and avoid collisions between people.
(4) The ground shall be constructed of hard, smooth and easy-to-scrub materials. Ground drainage is arranged at a low angle with a slight inclination, which is beneficial to discharge sewage and cover the drainage holes, so as to avoid polluted air entering the room or being blocked by foreign bodies. It should be smooth, smooth, wear-resistant, corrosion-resistant (acid, alkali, medicine), easy to clean. Rubber, polyurethane coatings, resins, etc. can be selected, with fewer seams. It can avoid the accumulation of dirt and bacteria, and it is easy to resist dirt and clean, feet feel comfortable, patterns are diverse, and easy to install and replace.
(5) Power supply: Dual-phase power supply facilities should be provided to ensure safe operation. Each operating room should have enough electrical outlets to facilitate the power supply of various instruments and equipment. The socket should have a fire-proof device, and the ground of the operating room should be equipped with conductive equipment to cause explosion by fire-proof fireworks. Electric sockets should be sealed to prevent water inflow and circuit faults affecting the operation. The main power supply line is centralized in the wall, and the central suction and oxygen pipeline devices should be set in the wall.
(6) Lighting facilities: ordinary lighting should be installed on walls or roofs. Operative lighting should be equipped with mother-child shadowless lamp and spare lifting lamp.
(7) Water source and fire protection facilities: taps should be installed in each workshop to facilitate flushing. Fire extinguishers should be installed in corridors and auxiliary rooms to ensure safety. Cold hot water and high pressure steam should be fully guaranteed.
(8) Ventilation filter sterilization device: Modern cleaning operating room should establish a perfect ventilation filter sterilization device to make the air clean. The ventilation modes are turbulent, laminar, vertical and optional.
(9) Distribution of access routes in purifying operating room: The layout design of access routes should meet the requirements of functional flow and pollution zoning. There should be three access routes, one for staff, the other for injured patients, and the third for equipment dressings, etc. to achieve isolation as far as possible and avoid cross-infection.
Temperature regulation in operating room is very important. It should be equipped with heating and cooling equipment. Air conditioner should be installed on the upper roof. Room temperature should be kept at 24-26 C. Relative humidity should be 50%. The General operating room is 35-45_and the special room is about 60_. It is suitable for cardiopulmonary bypass and organ transplantation. The area of small operating room is 20-30. 。
Shandong Aide Purification Engineering Co., Ltd. has strong technical strength and construction experience, according to the different needs of clean places, using professional equipment, to form different levels of clean standard space, to create the most suitable production and working environment. At present, it has established close cooperation with many enterprises and is a trustworthy professional purifying project implementer. Wechat Public Number: Aide-188