How is the acceptance criterion for purification engineering stipulated?
Release time:2019-08-05 source:
The purification project can ensure that the cleanliness, temperature, humidity and pressure of the original set requirements can be maintained in a specific space, regardless of the change of outdoor air conditions. After the construction of the dust-free room project is completed, the project acceptance (completion acceptance, function acceptance, use acceptance) shall be carried out. So how does the acceptance criterion of purification project stipulate?
1. The construction unit shall be responsible for the acceptance of the completed project and organize the acceptance of the construction, design and supervision units.
2. Functional acceptance shall be carried out after completion of acceptance. The construction unit shall be responsible for the acceptance, and the third party with corresponding inspection qualification shall conduct the inspection. Cooperate with design and construction units.
3. The inspection status of dust-free room purification project acceptance can be divided into empty state, static state and dynamic state. Inspection at the completion acceptance stage should be carried out in the air state; function acceptance stage should be carried out in the air state or static state. It should be determined by the builder, the designer and the builder through consultation, and it should be carried out in the static state; inspection at the use acceptance stage should be carried out in the dynamic state.
4. The acceptance of use shall be carried out after the completion of the functional acceptance. The construction unit shall be responsible for the acceptance. It may be tested by a third party with corresponding testing qualification or by the construction unit jointly with the third party. Cooperate with design and construction units.
Only after the acceptance of the purification project meets the standards, can the dust particles, odors, toxic gases and bacteria in the air be controlled and the quality of products be guaranteed.
The professional technicians of Ed Purification Engineering design a reasonable plan to adapt to the production process and the cost of the project. The design technical indicators meet the national standard of clean room. The experienced construction team of the purification project is fast and efficient, and the after-sales service is perfect. Consultation hotline: 400-0633-028