Attentions in Decoration and Design of 100,000 Grade Purification Project
Release time:2019-08-07 source:
Purification engineering has been widely used in China, and the production workshop, as the most important part of the production enterprises, plays an important role in the daily production work. Because the workshop functions of different enterprises are different, after all, the products produced are different, so in the decoration design of 100,000-grade purification project, it is particularly important to do the necessary functions and innovations. How can we do the decoration design of 100,000-grade purification project? Purification and Installation Company Ed Purification Part for you to sort out the following:
Attentions for decoration of 100,000-grade purification project:
In the renovation stage of 100,000-grade purification project, indoor floor, suspension items, wall doors and windows, ceiling and other civil construction and HVAC, power lighting, weak electricity, water supply and drainage, equipment and many other three-dimensional intersection operations, at this time, the various processes are intersected and overlapped more, the running distance is short, the amount of dust is large, the construction strictly abides by the technological process, and also requires. To achieve: the construction personnel enter the site to wear neat, not to bring in dirt and other debris, late entry should be replaced shoes, all decoration materials, installation parts in place before entering the site to clean up according to requirements, to achieve the required cleanliness, walls, ceiling and other structures before closing, must be used for the surface of all objects in the enclosed space. Vacuum cleaner dust removal or wet cleaning, so that dust-free accumulation, dust-producing operations in a special closed room, cleaning works in the room should be regularly cleaned to prevent dust diffusion, strictly prohibit the non-clean items, mildew-prone items into the scene.
Purification company Aide Purifies according to the actual situation of the enterprise, reasonably designs the plane layout of the purification workshop, uses professional ventilation equipment, lamps and lanterns, controls indoor temperature, humidity, brightness, bacterial colonies and so on, and builds a purification workshop for the enterprise.