What points should be paid attention to during the construction of dust-free workshop?
Release time:2019-08-15 source:
Before the construction of dust-free workshop, a reasonable design and a set of perfect and professional dust-free construction plan are needed to make the whole construction completed efficiently. As a professional dust-free workshop company, Ed Purification has rich experience and efficient treatment scheme, which can meet the needs of customers. What points should we pay attention to in the process of dust-free workshop construction are introduced by Ed Purification below?
1. Firstly, confirm the design drawings and requirements of dust-free workshop construction engineering, and form a reasonable plan. Each department should communicate with each other and study the matters needing attention in the process of operation.
2. Check all materials and equipment used in the construction process of dust-free workshop to meet the required standards, and use them only after passing the inspection.
3. Attention should be paid to the construction progress and quality during the construction of dust-free workshop. Construction inspection records and construction acceptance records should be filled in in time. Documents should be synchronized with projects.
4. Dust-free workshop construction process should be sequential, can be constructed at the same time, but we should pay attention to the relationship between each other, can not have any material on the first part of the construction.
5. All materials should be protected against rain and snow to prevent material from oxidizing and decaying. Special protection areas should be set up for important equipment.
6. Strictly implement the construction management system. Safety protection and safety training for all construction personnel should be done on site.
7. Energy saving and environmental protection. During the construction of dust-free workshop, transportation, storage and construction, it is forbidden to pollute the environment.
Dust production of building materials is a source of pollution that can not be ignored. Practice has proved that, even in the case of no collision, the surface of building materials is constantly emitting particles to the surrounding space, which are directly related to the use status, quality and aging degree of materials. In the clean workshop of an electronic factory, some electronic products will be affected by the deposition of chemical pollutants on the surface of the products, which will affect the quality of the products or cause chemical reactions in the subsequent production process, resulting in inferior products and even waste products. Therefore, decorative materials (including sealing materials) in the dust-free workshop of an electronic factory shall not be used. 。 When designing or choosing decorative materials for dust-free workshop, it should be coordinated with the owner of the specific project or the production process provider.
Shandong Aide Purification Engineering Co., Ltd. devotes itself to the fields of medical purification engineering, laboratory system engineering, clean workshop system and so on. After years of development, it has accumulated rich industry experience and gained "China's 3.15 Consumer Trusted Products", "Excellent Engineers in HVAC Purification Industry in 2017" and "Enterprises in 2017". The prize of listing and listing in the stock market reform is a powerful enterprise in the clean Engineering industry. To learn more about the medical purification industry, please pay attention to the Wechat Public No. Aide-188 (Ed Purification and Oxygen Supply)