Installation Method of Medical Protection Door
Release time:2019-10-09 source:
Installation Method of Medical Protection Door
Installation of medical protective door
1. Process flow: Describe the installation position of doors and windows, and temporary fixed installation of vertical steel doors and windows wedges, and NG hardware fittings for fans and doors
2. Drawing rules: According to the installation position, size and height of the protective door on the design drawings, the edges of the windows on both sides are measured according to the midline of the windows.
Three. According to the requirement of the number of doors and windows in the drawings, the protective doors are transported to the installation site separately, and the cushions are firm to prevent collision and damage.
4. Protect the door frame in place, insert the fixed iron foot into the reserved hole to find the right suspension and vertical suspension, ensure accurate position, temporarily fixed with wooden wedge, the frame on the window is 2 cm away from the cross beam, there is a gap between left and right. With the same width, the outer wall size meets the design requirements.
5. After installation of the steel portal frame, the position and height should be checked. After meeting the requirements, the iron foot of the upper frame and the iron parts of the beam should be firmly welded. The iron feet on both sides of the window should be inserted into the reserved holes, wetted with water, blocked, and kept tightly with 1:3 dry and hard mortar.
6. Installation of doors and windows: Check whether the width of the upper, middle and lower parts of the door frame is the same. After determining the opening direction, the net size of the door and window frame mouth is measured, and then the height and width of the fan are determined. Hang up the fan, check whether the clearance meets the requirements, whether the fan and frame are flat, whether the fan can be closed. After passing the inspection, the screw should be aligned completely. For the installation of double doors, attention should also be paid to the staggered opening process. According to the opening direction, the right door is the cover and the left door is the waiting door.
Design Scheme of Lead Glass Observation Window
The observation window is first sealed with lead-wood composite board, then installed with lead glass, and finally wrapped with 1.0mm drawing stainless steel or sprayed steel plate. Large angle closure ensures the doctor's visual field.
Established in August 2010, Shandong Aide Purification Engineering Co., Ltd. devotes ten years to the construction of special departments in hospitals. It is a professional enterprise of laminar flow operation room purification, clean operation room decoration, ICU ward construction, neonatal NICU construction, CCU ward, hospital laboratory, central supply room decoration, laminar flow ward construction and venous configuration center design and construction. The main target of service is large, medium and small hospitals with professional contracting qualifications related to purification projects. There are many cases in the industry. Welcome new and old customers to consult. To learn more about the medical purification industry, please pay attention to the Wechat Public No. Aide-188 (Ed Purification and Oxygen Supply)