Air cleaning system construction and installation requirements
Release time:2019-11-09 source:
The construction and installation of the purification air conditioning system is an important part of the construction of the purification plant, which must be organized and arranged according to the overall construction requirements, schedule and the unique construction procedures of the clean room. The construction and installation requirements of purification air conditioning system are as follows:
1. The enterprise undertaking the construction of clean air conditioning system in dust-free room shall have the corresponding construction and installation qualification, and conform to the corresponding quality management system.
2. The construction enterprise undertaking the construction and installation of the clean air conditioning system of the clean room shall arrange the construction according to the overall construction procedure and schedule of the clean room project, and pay attention to the mutual cooperation with the civil engineering construction and other professional types of work. In the process of construction, the handover with each professional project shall be completed as required, and the finished "finished products" shall be protected mutually, and necessary handover procedures and signing record documents shall be handled carefully, some of which shall be signed by the owner and the supervisor.
3. The construction and installation of the clean air conditioning system in the clean room, the production of air ducts and accessories, the installation, inspection and acceptance, and testing of equipment and pipes shall comply with the relevant provisions of the code for construction and acceptance of clean rooms (CB 50591-2010) and the code for construction quality acceptance of ventilation and air conditioning works (GB 50243-2002).
4. Different dust-free rooms have different construction and installation plans and procedures for their purification and air conditioning systems. Therefore, they must be carried out in strict accordance with the requirements of the design drawings. In case of modification due to various reasons during construction, it shall be approved by the project supervisor and designer, and if necessary, it shall be approved by the owner. In the process of construction, when the construction enterprise is required to undertake the necessary in-depth design, its design documents shall be confirmed by the designer.
5. The materials, accessories or semi-finished products used in the construction process must be accepted in accordance with the relevant provisions and requirements of the specifications and design drawings, approved by the project supervisor, and quality records shall be made.
6. Concealed works. Before concealment, it must be accepted and approved by the project supervisor, and quality records shall be made.
7. The subdivisional works of purification air conditioning system generally include: production of air duct and accessories, installation of air duct system, installation of silencing equipment and accessories, installation of fan, installation of air conditioning equipment, system detection, installation of high efficiency air overspeed device, installation of local purification equipment, heat insulation of air duct and equipment, etc
Shandong ed purification Engineering Co., Ltd. focuses on laboratory system engineering, medical purification engineering, purification plant system engineering. It has relevant business qualifications in the industry, from engineering consulting design, construction management, supply of equipment and consumables, technical services, to laboratory certification, maintenance management, etc., to provide a comprehensive and complete solution for the medical purification engineering, laboratory system engineering, purification plant system engineering industry. For more knowledge of medical purification industry, please pay attention to WeChat public address: Aide-188 (Ed purify oxygen supply).