Five steps of installation and construction of laminar flow purification operating room
Release time:2019-11-14 source:
Generally, the installation and construction of laminar flow purification operating room can be divided into the following five steps:
1. Rough preparation
At the beginning of the project, the concrete of the whole floor has been poured, and the necessary insulation and waterproof layer have been treated. After that, the purification engineering company will enter the site, set out according to the design drawings determined by the hospital, plan the layout of each room, and prepare the next frame materials.
2. Framework construction
The framework shall be built according to the setting out position of each room, and necessary space shall be reserved for the laminar flow box. After the basic framework is built, the prototype of the entire operating room is formed. Next, the construction will be carried out in the ceiling space.
3. Laminar flow layout and electrical laying
The integrated laminar flow box is fixed in the center of the ceiling of the operating room, and fixed with the surrounding frame. After the laminar flow box is fixed, the air outlet and air supply pipes will be laid. In the whole ceiling space, the most occupied space is the air outlet and air supply pipe. According to the specifications of the laminar flow box, the sizes of the air outlet and air supply pipes are different; according to the locations of different rooms, the laying methods and space locations of the air outlet and air supply pipes are also different. After the fixing of air outlet and air supply pipes is completed, the laying of power lines and gas pipes will be started.
4, built-in
This stage is to do the interior decoration of the operating room, mainly including the laying of wall, top surface and ground, the installation of operation related equipment and storage room, the installation of ceiling lighting, fire fighting and alarm. After this stage, the whole operating room is basically formed and ready for test acceptance.
5. Test acceptance
In the final closing process, the main steps closely related to equipment installation include gas pipeline pressure maintaining test, power supply test, relevant surgical instruments and equipment test, as well as the most important operating room purification laminar flow test. After this stage, the laminar flow purification operating room can be put into formal use.
This paper briefly introduces the installation process of laminar flow purification operating room. Compared with you, you have a preliminary understanding of site construction.
Shandong ed purification Engineering Co., Ltd. is a medical professional engineering overall scheme supplier with the core of clean operation Department purification, clean operation room decoration, ICU ward construction, neonatal NICU construction, CCU ward, hospital laboratory, central supply room decoration, laminar flow ward construction and vein configuration center. The overall plan of medical professional engineering is to provide professional, systematic and integrated solutions such as medical professional engineering consultation, planning and design, production and manufacturing, construction and installation, maintenance and so on, centering on the needs of customers. The company is one of the major providers of overall medical engineering solutions in China. It adheres to the service principle of "customer first, service first", adheres to the business philosophy of "integrity-based, win-win cooperation", provides modern overall medical engineering services for hospitals, creates safe, clean and intelligent life support projects, and provides safe, advanced and reliable life support systems. For more knowledge of medical purification industry, please pay attention to WeChat public address: Aide-188 (Ed purify oxygen supply).