Some details of workshop purification engineering construction
Release time:2020-01-08 source:
In the construction process of workshop purification project, the structural decoration part is the focus of the whole project, which directly affects the use and aesthetic effect of the whole workshop purification project. In the construction of workshop purification project, some specific construction details should be paid attention to:
Operation room purification workshop purification laboratory purification
(1) According to the requirements of the design specifications, the parts that are not easy to clean shall be avoided during the design and installation of the workshop purification project. During the decoration of the workshop purification project, the joint joints between the door and window installation and the building, purification air conditioning, various pipelines and lighting fixtures shall be sealed.
(2) All accessories, partition walls, ceiling fixing and hanging parts can only be connected with the main structure, and can not be mixed with equipment and pipeline supports, to prevent the decoration materials from loosening and dust falling off due to micro vibration.
(3) The gap between the architectural decoration and doors and windows of the workshop purification project shall be sealed at the front.
(4) According to GMP certification and inspection standards, interior decoration shall meet the following requirements:
a. The materials with good air tightness and small deformation under the change of temperature and humidity shall be selected.
b. The surface of the wall and ceiling shall be smooth, flat, free from dust, dust, corrosion, impact, easy to clean, reducing concave and convex surfaces. Fillet with radius equal to 50mm shall be made at the joint of wall and ground. The wall color should be harmonious, elegant and easy to identify pollutants.
c. The doors and windows of the workshop purification project shall be straight with the inner wall, and the structure shall fully consider the sealing of air and water vapor, so that the pollution particles are not easy to penetrate from the outside, and prevent condensation due to the indoor and outdoor temperature difference. The interior doors, windows and partitions between rooms with different cleanliness shall be sealed.
(5) During the construction of the workshop purification project, the dust emission during the construction shall be controlled, especially the concealed space such as the ceiling and the interior of the sandwich wall, which must be cleaned at any time.
(6) The workshop purification project is in the room where the high efficiency filter has been installed, so it is not allowed to carry out the decoration work with dust.
(7) Pay attention to the protection of the finished working surface of the workshop purification project, and do not cause the plate depression, dark crack and surface decoration pollution due to impact, knocking, trampling, water operation, etc.
As a powerful purification engineering company in China, Shandong ed purification Engineering Co., Ltd. has a special project department responsible for the design, production, installation and commissioning of purification in food workshop, cosmetics workshop, printing and packaging workshop, and electronic dust-free workshop. The company integrates professional scheme design team, complete supporting product channels, professional system construction team and perfect after-sales service. With the relevant construction qualification issued by the national construction department; with an experienced engineering technology research and development team; with years of professional accumulation in the field of purification, combined with the construction management practice of many domestic projects, to provide comprehensive and high-quality overall purification system technical support for domestic customers. If you want to know more about the workshop purification construction, please contact the engineering personnel of the project department in detail. For more knowledge of clean room purification industry, please pay attention to WeChat public address: Aide-188 (Ed purified oxygen supply).