Strict requirements for purification engineering in operating room
Release time:2020-01-15 source:
The purification engineering of operating room needs strict requirements. Hospital medical industry is a very large and special industry, especially the hospital operating room has a high requirement for air cleanliness. Generally, the qualified hospital operating room purification project or medical clean room requires a low efficiency of 30% prefilter and 90% sub high efficiency filter to filter the hospital air. In general, high efficiency filter is not required, but in special cases, such as isolation room, specific testing and nursing area, high efficiency filter is required.
The wall body of operating room and clean inner corridor is made of antirust, scrub resistant, acid and alkali resistant, fire-proof, sound insulation and heat preservation metal materials (imported electrolytic metal plate or color steel plate) to make anti bacteria wall, and the wall connection is in arc form. Color steel plate shall be used for clean external corridor and other auxiliary rooms, and the thickness of color steel plate shall be in accordance with the standard. All floors of the operation Department are made of imported anti-static, antibacterial, fireproof and wear-resistant PVC rolls. All the joints of the coiled material are hot welded and welded, flat and seamless, and arc connected with the wall. The ceiling height of the operating room is designed to reach 2800mm, and the material of the operating room (except for the debridement room) is the same as that of the wall. The ceiling height of corridor and auxiliary room is designed to reach 2800mm, and color steel plate ceiling is adopted.
The purification air-conditioning system shall keep the clean operating department under control, ensure the overall control of the clean operating department and flexible use of each clean operating room. The clean operating room shall be equipped with a purification air-conditioning system separately from the auxiliary room, and the design parameters shall conform to the provisions of the construction standard of the clean operating Department of the hospital as far as possible. The air supply outlets in the clean operating room shall be centrally arranged above the operating table, so that the operating table and surrounding areas are located in the main flow area formed by the clean air flow. The clean operating room adopts aluminum alloy spray ceiling air supply device for air supply, and the size of the air supply device shall be no less than 2.4 * 2.6 for Grade 100 and 1.4 * 2.6 for grade 10000 respectively. The clean operating room shall adopt double side lower return air. The height of the upper side of the air return opening shall not exceed 0.5m above and below the ground, and the height of the lower side of the air return opening shall not be less than 0.1M from the ground.
There are many strict requirements for purification engineering in operating room. Please call us for consultation.
Shandong ed purification Engineering Co., Ltd. is committed to purification engineering of medical operating room, laboratory system engineering, workshop purification system and other fields. After years of development, it has accumulated rich industry experience and won honors such as "China 3.15 consumer trustworthy products", "2017 excellent engineering company in HVAC purification industry", "2017 listing award of enterprise share reform", It is a powerful enterprise in purification engineering industry. For more knowledge of medical purification industry, please pay attention to WeChat public address: Aide-188 (Ed purify oxygen supply).