Construction Requirements and Maintenance Management of Dust-free Workshop in Purification Project
Release time:2019-07-18 source:
The construction requirements and maintenance management of dust-free workshop in purification project are mainly divided into two aspects. The decoration of dust-free workshop and the requirements of cleanliness of dust-free workshop are discussed below.
I. Decoration of Dustless Workshop
The decoration of dust-free workshop should first carry out reasonable technological process and building plane settings, and then select the building structure and building materials that accord with the characteristics of dust-free workshop. Dust-free workshop decoration should be based on the local energy supply background, and then air conditioning purification device and exhaust system are separated.
Reasonable selection of air purification equipment, whether new or reformed dust-free workshop, must be in accordance with the relevant standards and norms for decoration.
Dust-free workshop decoration construction projects:
One
Partition board
Including windows, doors and materials are coloured steel plates, but there are many kinds of sandwiches of coloured steel plates.
Two
Ceiling
Including suspenders, steel beams and ceiling lattice beams, the materials are generally colored steel plate and dust-free plate.
Three
Lighting appliances
Use special dust-free lamps and lanterns
Four
floor
Elevated floor or anti-static PVC floor or epoxy floor
Five
air conditioning system
Including mainframe, air duct, filter system, FFU, etc.
II. Requirements for cleanliness in dustless production workshops
How to achieve cleanliness in dust-free workshop? In order to achieve the cleaning effect required by the process, the dust-free workshop must reasonably understand the process, cleanliness level and special requirements required by the workshop before construction. In the process of construction, careful and reasonable construction and installation are needed. The most important thing is to use the dust-free workshop correctly and maintain the workshop management system reasonably so that the dust-free workshop can achieve good purification effect and achieve the required cleanliness.
In order to achieve the required cleanliness in the dust-free workshop, four requirements must be met:
01
The air flow in the workshop must be uniformly supplied and exhausted back and forth.
02
Attention must be paid to the conveyance and speed of air flow. Full ventilation can eliminate air pollution in dust-free workshop.
03
Temperature and humidity in dust-free workshop should be well controlled to prevent the influence of temperature and humidity on the production and quality of products.
04
Dust-free workshop must maintain a certain positive pressure to ensure that the dust-free workshop is not affected by pollutants.
3. Maintenance and management of hardware facilities in dust-free workshop
1. Keep proper positive pressure (> 0.5mmAq) in dust-free workshop to prevent air leakage in clean system. Before personnel, equipment and raw materials enter the dust-free workshop, they should do a good job of cleaning, wiping and other dust-proof work, and properly manage and set up air filters.
2. Preventing indoor dust generation: Pay attention to the correct selection of dust-free workshop materials, such as partitions and floors; dust prevention of manufacturing equipment, production automation and non-gathering of personnel, management of clean clothing, use of special equipment for dust-free workshop, etc.
3. Indoor dust does not accumulate: the wall should be smooth without dead corner, dust-free workshop should be regularly maintained and cleaned, and there should be space around the process equipment.
4. Dust should be removed immediately.
Edward Purification has been developing in the field of clean Engineering for many years, and has implemented a series of workshop purification projects. For some difficult projects, it has been perfectly completed through excellent technical strength and well-trained construction team of clean engineering.