The function and application requirements of lifting tower in laminar flow operating room
Release time:2019-10-18 source:
There is a relatively strict installation method for the tower installation in the operating room, including the distribution of equipment in some departments. The functional requirements of each operating room are different, so the tower installation must be carried out in strict accordance with the installation scheme. The installation of suspension tower is simple, but if it is done according to the plan, it will bring a lot of difficulties to the hospital because of the requirements of the equipment installation plan for the operating room.
As well as the area of the operating room, there are strict requirements, so it is difficult to implement. Therefore, we should study this plan carefully, install it in strict accordance with the plan, and use the correct method. Complete the installation work for the smooth operation.
All ICU and Thoracic Surgery ICU adopt suspension bridge type dry and wet separation tower. The air and electric terminals are set on the hanger air electric box for easy connection. It can manually control the horizontal movement, mechanical brake / pneumatic brake. One side is the wet tower, which can be extended to fix the infusion pump, injection pump, infusion rack and place the nursing equipment; the other side is the dry tower, which is used to place the monitor, ventilator and other equipment, and the ventilator screen is installed in place.
Each side of the tower is equipped with gas electric box, instrument platform and drawer, gas terminal, power socket, etc., each dry tower is equipped with 3 gases, and each wet tower is equipped with 3 gases. Double side instrument platform: 2 layers (with 1 drawer at the bottom), 1 stainless steel net basket hanging at the back. Function: each bed is equipped with 1 set of hanger type negative pressure suction device and 1 set of hanger type oxygen regulator.