What are the mandatory requirements in the renovation project of the hospital operating room?
Release time:2019-09-30 source:
He occupies a core position in a hospital, and needs to pay more attention to details than anywhere else. With the progress of society and the development of economy, medical technology, especially biological cleaning technology has been gradually promoted in the medical sector. After years of experience in hospital door decoration, we know that there are several mandatory requirements for decoration works.
1. cleaning operation room must be divided into clean area and non clean area. Buffer room or transmission window must be set between clean area and non clean area.
2. a functional grounding system with isolation transformer must be set up in cardiac surgery.
3. purification should be located in buildings with fire resistance rating of not less than two.
4. the purification plan should be treated effectively with personnel and articles (dressings, apparatus, etc.). The purification procedure should be continuously arranged and should not be interrupted by non clean areas.
5. Electrostatic air purification devices shall not be used as final purification facilities for air-conditioning systems.
6. it is forbidden to use wood and gypsum to expose exposed materials directly exposed to indoor air in operation room.
7. Exhaust duct outlet shall not be located in technical interlayer, but shall be directly outdoors.
8. purification must ensure the reliability of electricity. When the dual power supply is difficult, backup power should be set up, and it can be switched automatically in 1min.
9. Air filtration in purified air conditioning system shall be at least three-stage air filtration.
10. the electricity in the purified operating room should be separated from the auxiliary electricity, and the trunk of each trunk must be laid separately.
11. no wireless communication equipment is allowed in the purifying operating room.
12. It is strictly forbidden to use common fan coil or air conditioner in clean users.
Hospital purification project is a very large and special task, especially the operation room is directly related to the life safety of patients. Therefore, it is normal to have mandatory requirements for the decoration works of the operation room.
The aide purification project is a professional building hospital clean room, ICU, disinfection supply room, blood purification center, venous distribution center, CDC, digital integration, interventional therapy, positive and negative pressure, radiation protection, obstetrics, infant ward, burn ward, Department of medicine, laboratory, pathology, plastic surgery. The business scope of high-tech enterprises in purification projects mainly covers the design and construction of medical building decoration and decoration engineering, central air conditioning engineering, electrical engineering, intelligent engineering, water supply and drainage engineering, gas engineering, etc. The company integrates professional program design team, perfect supporting product channel, professional system construction team and perfect after-sale service. With relevant construction qualifications issued by the national construction department, an experienced R&D team of Engineering technology, relying on years of professional accumulation in the field of purification, combined with the construction management practices of many domestic projects, to provide comprehensive high-quality technical support for domestic customers. If you want to know more about the workshop purification construction, you are welcome to communicate with the project engineers in detail. For more knowledge of medical purification industry, please pay attention to the public address: Aide-188 (Ed purify oxygen supply).