What are the preparations for the design, construction and installation of the purification workshop in the electronic factory?
Release time:2019-12-19 source:
What are the preparations for the design, construction and installation of the purification workshop in the electronic factory?
I. to collect data and data related to production process, the base number and accuracy of indoor temperature and humidity shall be determined repeatedly with process designer and reasonable parameters shall be determined. Because the base number and accuracy have a great impact on the investment and operation cost, but it is necessary to meet the basic requirements of the process.
II. Collect the meteorological and surrounding environment data of the purification project site
A. In addition to the meteorological data of all seasons, the outdoor design parameters also need to collect the local environment.
B. the distance between the railway, wharf, airport and other transportation hubs and transportation arteries around the project.
III. collect relevant data of waste heat and toxic and harmful waste gas generated in the production process
A. determine the temperature of waste heat gas and the amount of exhaust air
B. the concentration, temperature and degree of harm of toxic and harmful gases and the air volume of exhaust air, and the treatment measures shall be considered.
IV. collect the requirements of production process for electricity, water, special gas and bulk gas.
V. collect the plan of construction, structure and process design of purification project
A. There are many kinds of processes used in process design and decoration of purification workshop of electronic factory. However, it is necessary to strictly follow the operation procedures, personnel flow routes and material transmission arrangements to avoid cross contamination.
B. on the premise of meeting the requirements of production process, micro vibration control, noise control, etc., the decoration (area) of purification workshop of electronic plant with high air cleanliness requirements should be arranged close to the air conditioning room, and the process or work (area) with the same air cleanliness level should be arranged centrally.
C. transportation, installation and maintenance channels or access doors shall be set according to process design requirements.
D. personnel purification devices shall be set for the decoration of personnel entering and leaving the purification workshop of the electronic factory, and airlocks or transfer windows shall be set for the entry and exit of materials and equipment.
As a powerful purification engineering company in China, Shandong ed purification Engineering Co., Ltd. has a special project department responsible for the design, production, installation and commissioning of purification in food workshop, cosmetics workshop, printing and packaging workshop, and electronic dust-free workshop. The company integrates professional scheme design team, complete supporting product channels, professional system construction team and perfect after-sales service. With the relevant construction qualification issued by the national construction department; with an experienced engineering technology research and development team; with years of professional accumulation in the field of purification, combined with the construction management practice of many domestic projects, to provide comprehensive and high-quality overall purification system technical support for domestic customers. If you want to know more about the workshop purification construction, please contact the engineering personnel of the project department in detail. For more knowledge of medical purification industry, please pay attention to wechat public number: aide-188 (ED purification oxygen supply)