Function and Attention Measures of Air Conditioning System Installation in Clean Engineering
Release time:2019-09-29 source:
Air conditioning system is a very important part of clean engineering to achieve the purification process environment. It is not only difficult but also complex to install it. In order to improve the use quality of clean workshop, we need to pay more attention to all aspects. Today, Ed Purifier will take you to understand the role of air conditioning system installation in clean workshop in clean Engineering and pay attention to measures.
Clean Engineering
In recent years, with the rapid development of China's economic and technological level, the requirements of production environment in some industries have been continuously improved, and clean workshop can provide a good production environment. Compared with ordinary buildings, clean workshop buildings have better control effect on noise, humidity, temperature and cleanliness. To a certain extent, they can also promote the progress of product processing and ensure the quality, precision and purity of products. In the construction process of clean workshop of clean engineering, the quality of installation and construction of air-conditioning system can directly affect the use quality of clean workshop, so more attention should be paid to the installation of air-conditioning system in clean workshop.
The concept of cleanliness should be fully implemented in the installation project of the clean workshop of the whole clean engineering. It should serve the concept of cleanliness from the selection of materials to the management of construction. To comply with the requirements of construction control system of clean workshop, the dress of construction personnel should meet the control requirements of different construction stages, and dust-emitting materials and tools should not be brought into the construction area.
In the installation and construction of air conditioning system in clean workshop, attention should be paid to the cooperation with other specialties to prevent mutual interference in specific construction. When there are contradictions with other types of work, we should actively mediate and adjust the construction plan. Clean workshop has more complex pipes, so it is very important to ensure the clearance of ceiling. It is necessary to coordinate the exhaust pipe, return pipe, air supply pipe, condensate pipe, return pipe, water supply pipe, etc. of HVAC specialty, the strong and weak electric bridge of electrical specialty, the drainage pipe, spray pipe, sewage pipe, fire water pipe and domestic water supply pipe of water supply and drainage specialty. Tube, etc.
Above is what Edward Purification Editor wants to share today. In the cleaning project, the staff of the purification workshop must pay attention to all aspects of details when installing the air conditioning system, so as to ensure the installation quality of the air conditioning system as far as possible.
Shandong Aide Purification Engineering Co., Ltd. has strong technical strength and construction experience, according to the different needs of clean places, using professional equipment, to form different levels of clean standard space, to create the most suitable production and working environment. At present, it has established close cooperation with many enterprises and is a trustworthy professional cleaner project implementer. To learn more about the medical purification industry, please pay attention to the Wechat Public No. Aide-188 (Ed Purification and Oxygen Supply)